Home

About Us

Advertisement

Contact Us

  • Facebook
  • X
  • Instagram
  • Pinterest
  • WhatsApp
  • RSS Feed
  • TikTok

Interesting For You 24

Your Trusted Voice Across the World.

    • Contacts
    • Privacy Policy
Search

All BART stations open for commute a day after fire shut down part of system

May 21, 2025
All BART stations open for commute a day after fire shut down part of system

Service to all 50 of BART’s stations resumed Wednesday morning, a day after a fire near the San Leandro station interrupted service between the Lake Merritt, Berryessa and Dublin stations, officials said.

According to BART, all stations were accessible even though the green line remained down on Wednesday. The green line runs from Daly City to Berryessa. Damage to the tracks left over from the fire prevented those tracks from being used, the agency said.

Related Articles


Fire near San Leandro BART station stops service between Lake Merritt, Dublin and Berryessa stations


San Jose BART extension: Why hasn’t VTA released the report that could offer millions in savings?


How a network connectivity issue caused BART to fully shut down for 5 hours


Affordable housing at East Bay BART station gets council backing


Emergency on BART tracks shuts down San Bruno station during morning commute

Delays were expected, and the trains that were running were doing so at slower speeds, according to the agency.

Passengers traveling from San Francisco can use the blue line that goes to Dublin/Pleasanton and transfer at Bayfair to an orange line train that will get them to Berryessa. Those traveling from Berryessa were told to use an orange line and transfer at Bayfair to a blue line Daly City train.

The stoppage Tuesday affected trains on all three of those lines from about 5:45 a.m. to 5:30 p.m. Limited service between the Berryessa and Hayward stations and Dublin and Bay Fair stations started about 5:30 p.m.

Investigators have not determined the cause of the fire.

The shutdown was the second major one on BART in less than two weeks. A system-wide closure on May 9 lasted from 4:25 a.m. to 9:20 a.m. A network connectivity issue that prevented controllers from seeing train locations caused that closure.

Featured Articles

  • A woman’s body was found stuffed inside her car’s trunk. Now, a jury will decide whether her fiancé is to blame

    A woman’s body was found stuffed inside her car’s trunk. Now, a jury will decide whether her fiancé is to blame

    May 21, 2025
  • San Jose: Man facing deportation charged with assaulting ICE officer

    San Jose: Man facing deportation charged with assaulting ICE officer

    May 21, 2025
  • Things to know about ‘no tax on tips,’ Trump’s tax pledge that’s included in GOP budget bill

    Things to know about ‘no tax on tips,’ Trump’s tax pledge that’s included in GOP budget bill

    May 21, 2025
  • California and Google will make a media fund for the floundering news industry

    California and Google will make a media fund for the floundering news industry

    May 21, 2025
  • State funders criticize pace and progress on $2.7 billion plan to build new reservoir in Santa Clara County

    State funders criticize pace and progress on $2.7 billion plan to build new reservoir in Santa Clara County

    May 21, 2025

Search

Latest Articles

  • A woman’s body was found stuffed inside her car’s trunk. Now, a jury will decide whether her fiancé is to blame

    A woman’s body was found stuffed inside her car’s trunk. Now, a jury will decide whether her fiancé is to blame

    May 21, 2025
  • San Jose: Man facing deportation charged with assaulting ICE officer

    San Jose: Man facing deportation charged with assaulting ICE officer

    May 21, 2025
  • Things to know about ‘no tax on tips,’ Trump’s tax pledge that’s included in GOP budget bill

    Things to know about ‘no tax on tips,’ Trump’s tax pledge that’s included in GOP budget bill

    May 21, 2025

181 Peachtree St NE, Atlanta, GA 30303 | +14046590400 | [email protected]

Scroll to Top